Application Details

Download PDF

File Number 3337
Application Type PU
Status
RFI Date
Application Submitted Date 2023-01-05
Application Fee Paid Date
License Expiration Date 2048-10-10
Notes
Applicant Lower Valley Water District 1557 FM Road 1110 Clint TX 79836
Primary Contact Daniel Hernandez
Engineer None
Surveyor Engineer & Surveyor: Isaac Camacho R.P.L.S. TX 5337 Brock & Bustillos Inc. 417 Executive Center, El Paso, TX 79902 (915) 542-4900 fax 542-2867 Engineer: Jorge L. Ascarate P.E. TX 85075 CEA Engineering group 1204 Montana Ave. El Paso, TX 79902 (915) 544-5232 Fax 544-5233
Proposed Use of District Property 12" water line with 24" casing via open cut trench method.
District Property Crossing Mesa Drain at Fenter Rd.

Documents Uploaded:

Document Document Title Note Relevant Status

Application Statuses:

File Closed 2024-08-08
Construction Completed 2023-11-09
Construction Started 2023-11-08
Posted for Board Agenda 2023-09-20
1st Review Letter Issued 2023-08-28
Revised Engineering Drawing Submitted 2023-08-24
1st Review Letter Issued 2023-06-29
Administrative Fee Paid 2023-03-02
Engineering Drawing Submitted 2023-03-02
Survey Submitted 2023-03-02
Application Submitted 2023-02-15